With the “public” spaces completed in time for the August Party, we circled back with Bonnie to work on the remaining rooms - the guest bedroom, the master bedroom, and the master bath. As before, her remit was paint, reorganize, accessorize, but the drywall remains intact with exception of light fixture updates and installation of medicine cabinets.
The color palette: ‘Pashmina Plum’ for the guest bedroom, ‘Faded Flaxflower’ for the master bedroom, and grass cloth wallpaper for the master bathroom (24 October).
The palatte plus the fabric to be used in the valances in the master bedroom (28 October).
After removal of the excess furniture for the floor installation (22 October).
New floor installed (23 October).
Painting complete, rug placed, and furniture returned (01 January).
Valences in place, pictures hung on walls (13 January).
Before (14 October).
New floor installed (24 October).
New towel set – color dictated by Bonnie (10 December).
Wall papering in progress – new faucets and medicine cabinets installed prior (12 January).
Wall papering complete - next up, install new light fixtures (12 January).
All done! (14 May).
Before (14 October).
After removal of the furniture for the floor installation (22 October).
New floor installed (24 October).
Painting complete (04 November).
Moving stuff back into the room (11 November).
Furniture in place, Mamie Myrt's quilt hung in a place of honor, pictures hung and mirror added (04 February).
Wall-moounted floating night stands on either side of the bed, my photo quilt which riffs on Mamie Myrt's quilt hung on opposite wall (04 February).